CLUB HISTORY

Jet PNG

Powered By EmbedPress

Slide Show Below Is Under Construction.
In Order To Stop The Slides Simply Move Your Cursor Over The Photo.
To Start Movement Again Move Your Cursor Off Of Photo.

The Vision
WCRC President, Joe Duncan created a model of the plan for the New Location for WCRC New Flying Field. 2019
The Vision
WCRC President, Joe Duncan created a model of the vision for the New Location for WCRC's New Flying Field. 2019
WCRC Group Survey 2019
Our trek up 650ft. Over 2 Football fields away to our new location
WCRC's Actual New Location Survey 2019
A group of WCRC Members Survey our New Location weeds and all. 2019
New Flying Field Lease Signing 2019
President, Joe Duncan signing the Lease Agreement with Greenville County 10,5,5 for a total of 20 years. With option to sign new lease at the end of 20 year term.
New Flying Field Lease Signing 2019
Vice President, David Hooks signing the Lease Agreement with Greenville County 10,5,5 for a total of 20 years. With option to sign new lease at the end of 20 year term..
WCRC Business Meeting For The Signing Of Lease 2019
WCRC club meeting for the signing of our New Flying Field Lease with Greenville County at Enroee Landfill and Transfer Station 2019.
WCRC Business Meeting For The Signing Of Lease 2019
WCRC club meeting for the signing of our New Flying Field Lease with Greenville County at Enroee Landfill and Transfer Station 2019.
Mowing New Runway Area
Mark Sumner mowing our flagged new runway. Getting it ready to apply dirt and fabric. November 2019
a birds-eye view
If you take a close look you can see the outline of the future club's runway, driveway, pilot area and conex container area that we mowed, getting ready to move forward.
WCRC Rents U-haul
We rented a Uhaul to pick up material for our driveway underlayment to new flying field location. And Runway Material 2019
Start Of Our Underlayment For Driveway 2020
Underlayment for our 650 ft of driveway to the flying field location place down before the gravel is laid to help prevent sinking. January 2020.
Start Of Our Underlayment For Driveway 2020
Underlayment for our 650 ft of driveway to the flying field location place down before the gravel is laid to help prevent sinking. January 2020.
Start Of Our Underlayment For Driveway 2020
Driveway Underlayment in the curve up to where our Conex (Shiping Container) will be placed. Mark Sumner and David Hooks in photo January 2020
The Begining Of Our Driveway Work
Eric and David, the beginning of putting down the the gravel over the underlayment. January 2020
Time For Gravel Rain or Shine
It's gravel time. Dave's dedication rain or shine the job must be done. January 2020
Driveway Moving Forward
The early stage of the gravel driveway and drainage pipe. This photo is near the curve only about 50 foot to go. January 2020
Time For Gravel
Gravel driveway work is moving along. January 2020
Let's Get Started
Mark Sumner and Steven Bayne.Time to start packing the gravel down with the SP-700 Roller borrowed from Triple Tree. January 2020
Roller Time
Mark Sumner driving the Rex SP-700 Roller to pack down the gravel driveway to give us access to our New Flying Field Pilot Area. 650 ft. of gravel to pack down so vehicles can reach the Flying Field
Time For Dirt
This is the beginning of putting dirt down.We had to put Red Clay Dirt down for the Pilot area, Conex Building and for the Runway. Look at the background and you can visualized where things are now. June 2020
Click Here
Dirt Delivery
We had to put Red Clay Dirt down for the Pilot area, Conex Building and for the Runway. This is a photo of the starting of our runway. June 2020
Flag & Windsock
We got our Conex Container In and it was time for our Flag & Windsock Pole to be installed. In photo Rudy, Larry and Eric. June 2020.
Flagpole & Windsock
We got our Conex Container In and it was time for our Flagpole & Windsock Pole to be installed. In photo Rudy, Freddie and Eric. That is some hard steel. We drilled and tapped it. June 2020.
Flagpole is Up
We got the Flagpole and Windsock up and you can see our early beginnings. Just dirt where we now have used soccer turf and no shade. July 2020
Runway Time
In July 2020 we began to put down the donated seconds material for our First Runway. I say first because about a year later a windstorm tore it all up and blew it way out into the landfill. Viritually nothing left. We cleaned up the damage and relaid the runway.
Used Turf
In July of 2021 we purchased out of Charolette, NC. some used Soccer Turf for our pilot staging area. Bill Smith in photo using his truck to pick up the material. This stuff was full of inlay and heavy!
Unloading Time
This stuff was so heavy it was almost impossible to roll off the trailer. We had to get a Skid Steer to move the material around and then it bend the steel forks on the skid steer. July 2021
It's Down
July 2021 after much extreme labourious work it's down. We trim the edges later to make it nice and neat. You notice our flight stands. Linda Davenport paid for the material and Freddie Davenport built them for the club. Free to the club.
Trimmed Up
We got the used soccer turf trimmed up and Rudy sitting ready to enjoy a flight, You can see our Pilot Safety Stands donated by Bob Puzsik. July 2021
Previous slide
Next slide